Drainage & Sewer Compliance · London
Build Over Agreements
Building over or near a public sewer? We prepare the drawings, design the foundations and handle water-authority liaison to approval.
The basics
What is a Build Over Agreement?
A Build Over Agreement is a legal contract required when building over or near a public sewer, drain or utility. It's typically needed when an extension or development sits above or adjacent to underground infrastructure — ensuring construction doesn't obstruct or damage existing utilities, and setting out maintenance responsibilities between the owner and the utility provider.
Why it matters
Why a Build Over Agreement is Important
Protection of Utilities
Safeguards public sewers, drains and utility lines so they remain functional and accessible for repairs.
Compliance with Regulations
Building over a sewer without the right agreement is often illegal — this keeps you compliant and avoids fines.
Preventing Future Problems
Clear guidelines on management, maintenance and future repairs help prevent disputes down the line.
Ensuring Safe Construction
Proper permissions ensure work protects both your structure and the infrastructure beneath it.
When you need one
When is a Build Over Agreement Needed?
Public Sewers
If building directly over or near a public sewer, an agreement ensures it can still be accessed for maintenance and repairs.
Private Drains & Sewers
If your construction impacts private drains serving neighbouring properties, the agreement clarifies upkeep responsibilities.
Utility Lines
Water, gas or electricity lines beneath the property may need special consideration to stay protected during construction.
The process
How to Obtain a Build Over Agreement
Consult Local Authorities
Contact your local water/utility company early — in the UK this is usually your local water company.
Submit Detailed Plans
Provide plans showing the location of existing sewers, drains or utilities and how the build interacts with them.
Provide Documentation
Details of the construction, how you'll protect the utilities, safety measures and proof of property ownership.
Review & Approval
The authority assesses whether the project interferes with utilities and complies with regulations, then issues the agreement.
Compliance During Construction
Work is carried out in line with the agreement, with extra precautions to protect the sewer or drain.
What's covered
What to Expect in a Build Over Agreement
- Location of existing infrastructure — maps and diagrams of the sewer, drain or utility beneath the site.
- Construction restrictions — limits on heavy structures or deep foundations directly over the infrastructure.
- Maintenance & access rights — who maintains the utility and how access for repairs is provided.
- Repair & modification guidelines — how future repairs are handled so the utility stays functional.
- Structural integrity requirements — design requirements so the build doesn't damage or obstruct the utility.
Good to know
Build Over Agreement FAQs
What is a Build Over Agreement?
When do I need a Build Over Agreement?
How do I apply for one?
Our work
Build Over & Drainage Work
Drainage plans, soakaways and approved agreements from recent projects.
Build Over — Drainage Plan
Build Over Drawing
Soakaway Detail
Foundation Detail
Site & Drainage Plan
Floor PlanTransparent pricing
Fixed-Price Packages
Fixed-price Build Over support — and packages for the wider project.
Essential planning drawings — the starting point for any straightforward extension.
Get a QuoteFull sewer compliance handled — Thames Water liaison for projects near or over a public sewer.
Get a QuoteFull planning service with 3D drawings and complete council submission.
Get a QuoteBuilding near a sewer?
Let Us Handle Your Build Over Agreement
Free drainage feasibility review and a fixed-price quote — we manage the drawings and water-authority liaison to approval.
