Party Wall Act 1996 · London
Party Wall Services
Building near a shared boundary? We handle the whole Party Wall process — notices, schedules of condition, drawings and awards — so your works start on time and stay lawful.
The basics
What is a Party Wall?
A party wall is a shared wall or boundary structure that divides two properties — common in attached and semi-detached buildings across London. It creates privacy and defines where one property ends and the next begins.
Under the Party Wall etc. Act 1996, if your works affect a shared wall or boundary — or involve excavating near a neighbour's foundations — you must formally notify the adjoining owner before you begin. We make sure that's done correctly.
Do you need one?
When the Party Wall Act Applies
You'll typically need to serve notice if your project involves any of the following.
Work on a Shared Wall
Cutting into, raising, thickening or rebuilding a party wall — e.g. inserting beams for a loft or extension.
Building at the Boundary
Constructing a new wall up to or astride the line of junction between the two properties.
Excavation Nearby
Digging foundations within 3m (and up to 6m) of a neighbour's structure, below their foundation level.
Extensions & Conversions
Rear/side extensions, loft conversions and basements that touch or undermine a shared structure.
The right notice
Three Types of Party Wall Notice
Line of Junction Notice
For building a new wall on or at the boundary line between your land and your neighbour's. Served at least 1 month before.
Party Structure Notice
For works to an existing party wall or structure — cutting in, raising or rebuilding. Served at least 2 months before.
Adjacent Excavation Notice
For excavating near a neighbour's foundations within 3m or 6m. Served at least 1 month before works begin.
How it works
The Party Wall Process
Assess
We confirm whether the Act applies and which notices are required.
Serve Notice
Compliant notices prepared and served on adjoining owners.
Respond
Neighbour consents or dissents; surveyor(s) appointed if needed.
Schedule & Award
Schedule of condition recorded; a Party Wall Award is agreed and signed.
Build
Works proceed lawfully, protected by the agreed award.
Transparent pricing
Party Wall Packages
Fixed-fee party wall services — choose the level of support your project needs.
- Review of whether the Act applies
- Correct notice type identified
- Notices prepared & served
- Plain-English guidance throughout
- Everything in Essentials
- Acting as Agreed Surveyor
- Schedule of condition
- Party wall drawings
- Signed Party Wall Award
- Several adjoining owners
- Two-surveyor appointments
- Excavation & basement works
- Full liaison to resolution
*Award fee is per adjoining owner. All prices indicative and exclude VAT & disbursements — confirmed after a free review of your project.
Our work
Recent Drawings & Projects
A selection of the architectural and structural work behind our party wall matters.
3D Visualisation — Proposed
3D Views — Extension
Elevations — Existing & Proposed
Floor & Roof Plans
Site & Location Plan
Structural DrawingGood to know
Party Wall FAQs
Who owns a party wall?
Can I make changes to a party wall?
How much notice do I have to give my neighbour?
What happens if my neighbour dissents or doesn't respond?
What is a Party Wall Award?
Do I need a party wall surveyor?
Need party wall help?
Get a Free Party Wall Review
Tell us about your project and we'll confirm whether the Party Wall Act applies, which notices you need, and a fixed fee — usually the same day.
